This new subdivision is being developed by the
Larrakia Development Corporation and they required a
capable landscape contractor to complete parklands
and drainage reserves in a tight time frame ahead of
wet season rains.
In addition to design and
construction of two gazetted parks with telemetry
controlled irrigation, a feature in the second stage
of the project was a large open drain which required
batter stabilisation.
Only a month out from the
impending wet season, Gimbells provided a fabric
reinforced grass solution for the problem which has
successfully handled stream flows around 2600 litres
per second. |